I am attempting to place microvias and buried vias on the same XY locations. As these will be constructed at different times in the manufacturing process. But The vias do not appear to connect properly.
Can anyone suggest if this is possible?
I am attempting to place microvias and buried vias on the same XY locations. As these will be constructed at different times in the manufacturing process. But The vias do not appear to connect properly.
Can anyone suggest if this is possible?