Hello,
I've been using Design Entry Cis 16.6 and I have an already finished big schematic with all components added from a Part Database (which is configured on the company's network).
All the components have a property which is the company's code.
The thing is, all the codes have been recently changed and I need to update the new values to the components placed on the schematic. Is there an easy way to do it? When I go to the Part Manager all the now changed component shows "Undefined", ever since I changed the companys code on the Database file. I do have a backup of the old database file (before the changes, all the parts were recognized there as from the database).